Informa engaged Limelight to work alongside PWC to ensure the integration and deployment aspects of their business transformation programme were being considered and that the programme was successful from a legacy integration aspect.
Running alongside the main programme was a smaller SAP migration project - a dependancy project that needed to be delivered on time as not to frustrate the bigger global transformation.