What did we help solve?

The Challenge

Informa had contracted PwC to deliver a large-scale global SAP transformation programme. The programme was progressing on plan — but Informa recognised that the most complex and highest-risk elements sat on the client side: business change, integration architecture, and a meticulous global cutover across multiple geographies.

They needed an independent expert team to own these workstreams — someone who could work alongside PwC without conflict of interest, and ensure the business was genuinely ready to receive the new system.

informa-office
What we achieved

Solution

Limelight took ownership of the deployment function — working alongside PwC and taking full responsibility for the client-side workstreams that would determine whether the programme landed successfully.

The change management function was professionalised and standardised using Limelight's accelerators and business readiness frameworks. A global communications and training programme was designed and delivered across all affected markets.

The integration layer was governed end to end — from requirements gathering through to testing and deployment — ensuring every interface between the new SAP instance and third-party systems was fully functional at go-live.

The global cutover plan was scripted to a meticulous level of detail, with business readiness checkpoints built in at every stage. A full legacy SAP system rebuild on a new instance was completed, with all legacy data migrated and validated.

informa-conference
What were the benefits?

Results

  • The programme went live on schedule across all geographies. Business readiness was confirmed at every stage before cutover proceeded — no workstream advanced without a signed-off readiness check.

  • The integration layer was fully operational at go-live, with no critical integration failures in the immediate post-live period.

  • The legacy SAP rebuild — which many considered the most technically complex element — was completed within the planned timeline, with full data migration and testing completed to the required standard.

  • Informa's business teams were prepared, trained, and confident in the new system from day one.